FABRICATION PLANT TAMBUN - BEKASI

Area
Closed Area
Open Area

= 6 Ha
= 4 Ha
= 2 Ha

PRODUCTION CAPACITY
1. TOWER + STRENGTHENING + GI
2. GUARD RAIL
3. PJU / HIGH MAST
4. MONOPOLE
5. BRACKET
6. SERVICES
7. GENERAL CONSTRUCTION

= 7.300 Ton/Month
= 4.000 Ton
= 1.250 Ton
= 700 Ton
= 300 Ton
= 150 Ton
= 200 Ton
= 700 Ton

FABRICATION PLANT SETU - CIBITUNG

Area
Closed Area
Open Area

= 3,2 Ha
= 2,8 Ha
= 0,5 Ha

PRODUCTION CAPACITY
1. ELECTRICAK POLE & FO
2. CONSTRUCTION & VMS

= 3.200 Ton/Month
= 1.200 Ton
= 2.000 Ton

FABRICATION PLANT CILEUNGSI - BOGOR

Area
Closed Area
Open Area

= 1,6 Ha
= 1,2 Ha
= 0,4 Ha

PRODUCTION CAPACITY
1. TELECOMMUNICATION POLE
2. MONOPOLE & TOWER
3. CONSTRUCTION
4. SEVICES

= 2.950 Ton/Month
= 1.500 Ton
= 550 Ton
= 800 Ton
= 100 Ton

FABRICATION PLANT CILEGON - BANTEN

Area
Closed Area
Open Area

= 1 Ha
= 0,4 Ha
= 0,6 Ha

PRODUCTION CAPACITY
1. PIPE
2. SHEARING PLAT SERVICES
3. SLITTING COIL SERVICES
4. FABRICATION

= 7.000 Ton/Month
= 1.000 Ton
= 2.000 Ton
= 2.500 Ton
= 1.500 Ton

GALVANIZED PLANT CIKARANG - JABABEKA

Area
Closed Area
Open Area

= 1,1 Ha
= 0,3 Ha
= 0,8 Ha

PRODUCTION CAPACITY
ZINK BATH SIZE :
    -LENGHT
    -WIDTH
    -DEPTH

= 2.950 Ton/Month

= 7,5m
= 1,5m
= 2,4m